1.Which of the following is considered a major process flow structure?

  • Lead Time
  • Fabrication
  • Lean Manufacturing
  • Project

 

2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

  • Certification is sought by any firm assuming they pay annual dues.
  • 2nd Party – where a customer audits its supplier
  • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
  • 1st Party – where a firm audits itself against ISO standards

3.Which of the following is ISO 14000 primarily concerned with?

  • Quality management
  • Time management
  • Continuous improvement management
  • Environmental management

 

4. Which is the one correct value stream principle?

  • Look for efficiencies in the factory, office, physical, procedural, and technical operations.
  • Eliminate waste that stops, slows down, or diverts the value stream.
  • Concentrate on speeding up value-adding operations rather than removing waste.
  • Keep the value stream moving at minimum velocity.

5. What is the starting point in developing a capacity plan for a health care operation?

  • Determining the effective capacity over time
  • Estimating design capacity
  • Forecasting patient demand for a reasonable length of time
  • Discovery of the bottleneck operation

 

6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

  • MRP (Material Requirements Plan)
  • ERP (Enterprise Resource Planning)
  • MPS (Master Production Schedule)
  • WBS (Work Breakdown Structure)

7.Which of the following is an element that addresses elimination of waste under lean production?

  • Kanban production control system
  • Production ahead of demand
  • Minimized run times
  • Group plant loading technology

8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

Solution: #6122

OPS571 Final Exam Complete Solution

1.Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an ...
Tutormaster
Rating: A+ Purchased: 11 x Posted By: Kingtut
Comments
Posted by: Kingtut

Online Users